Link


Social

Embed


Download

Download
Download Transcript

GOOD AFTERNOON EVERYONE. IT'S 1:30. I CALL THE MEETING TO ORDER AND WE'LL START WITH A ROLL CALL.

[00:00:07]

MR. ROACH. HERE, MS WEMLINGER. CHAIR EASTER. HERE.

MR. FARNSWORTH. HERE. MR. TITUS. HERE. AND IF YOU JOIN ME IN STANDING FOR A MOMENT OF SILENT PRAYER, FOLLOWED BY THE PLEDGE OF ALLEGIANCE.

I PLEDGE ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA AND TO THE REPUBLIC FOR WHICH IT STANDS.

ONE NATION UNDER GOD, INDIVISIBLE, WITH LIBERTY AND JUSTICE FOR ALL.

[C. APPROVAL OF MEETING MINUTES]

PLANNING COMMISSION HAS HAD THE OPPORTUNITY TO REVIEW THE MEETING MINUTES FROM THE LAST MEETING, WHICH WAS MAY 5TH.

IF THERE ARE NO DISCUSSION ITEMS, WE CAN MOVE FORWARD WITH THE MOTION.

CHAIR, I'LL MAKE A MOTION THAT WE ACCEPT THE MEETING MINUTES WRITTEN AND AS AS WRITTEN AND NOTED.

SECOND. OKAY. ROLL CALL. CHAIR. OYSTER. YES. MR..

FARNSWORTH. YES. MR.. TITUS. YES. MR.. ROACH.

YES. ALL RIGHT. WE HAVE ONE ITEM TODAY, AND THAT IS GROVE CITY CHURCH OF THE NAZARENE FIELD HOUSE.

[1. APPLICATION: Grove City Church of the Nazarene Field House]

FINAL DEVELOPMENT PLAN. WE'LL ASK FOR YOUR REPRESENTATIVE TO STEP UP TO THE PODIUM.

AND WHEN YOU DO, IF YOU COULD STATE YOUR NAME AND YOUR ADDRESS.

AND THEN IF YOU WOULD JUST STAY THERE, THE CITY WILL PROVIDE SOME BACKGROUND INFORMATION, AND THEN WE'LL HAVE A LITTLE BACK AND FORTH WITH ANY QUESTIONS AND WE'LL MOVE FORWARD.

DAVID MCKNIGHT 3351 MCDOWELL ROAD. THANK YOU.

THE PROPOSED DEVELOPMENT PLAN IS FOR A FIELD HOUSE FOR THE CHURCH OF THE NAZARENE.

THE CHURCH OF THE NAZARENE HAS HAD PREVIOUS DEVELOPMENT PLANS FOR ADDITIONS IN 2023 AND 2025.

THE PROPOSED 3300 ZERO SQUARE FOOT BUILDING IS LOCATED ON THE SOUTH SIDE OF THE SITE, ADJACENT TO THE EXISTING STADIUM, AND WILL INCLUDE GYMNASIUM GYMNASIUMS, TRAINING FACILITIES AND SUPPORT SPACE FOR THE CHURCH AND SCHOOL.

ACCESS FOR THE FIELDHOUSE WILL REMAIN UNCHANGED OFF OF HOOVER ROAD, AND THE DRIVE AISLE BEHIND THE STADIUM WILL BE RELOCATED TO THE EAST TO MAKE ROOM FOR THE FIELDHOUSE. PLANS SHOW A PEDESTRIAN PLAZA BETWEEN THE EXISTING STADIUM AND THE PROPOSED FIELDHOUSE, WHICH IS ENCLOSED BY A BLACK CHAIN LINK FENCE AND A METAL GATE ON THE NORTH AND SOUTH END.

BALL BALLERS ARE PROPOSED OUTSIDE OF THE METAL GATE TO LIMIT VEHICULAR ACCESS.

FUTURE REVIEWS OF THE BOLLARDS WILL NEED TO BE REVIEWED DURING THE SITE IMPROVEMENT PLAN TO MAKE SURE THAT THEY MEET EMERGENCY RESPONSE STANDARDS.

THE FIELD HOUSE MEASURES A MAXIMUM HEIGHT OF 36.5FT AT THE HIGHEST POINT, WHICH EXCEEDS THE PERMITTED MAXIMUM HEIGHT OF 35FT IN THE SD1 DISTRICT AND WILL REQUIRE A VARIANCE TO BE CONSTRUCTED AS PROPOSED. STAFF IS SUPPORTIVE OF THE VARIANCE, NOTING THAT THE PROPOSED FIELD HOUSE IS LOCATED INTERNALLY ON THE SITE AWAY FROM THE RESIDENTIAL AREAS, AND THE BUILDING ONLY EXCEEDS THE PERMITTED HEIGHT BY 1.5FT AT THE HIGHEST POINT.

THE BUILDING WILL BE FINISHED IN A VARIETY OF MATERIALS, WHICH ARE SIMILAR TO THE REST OF THE CAMPUS.

METAL PANELS ARE PROPOSED AS THE PRIMARY FINISH, ALONG WITH BRICK AND FLOOR TO CEILING GLASS AND EFFORTS AROUND THE ENTRYWAY.

PLANS ALSO SHOW A 14,000 SQUARE FOOT FUTURE ADDITION FOR THE GYMNASIUM AND WITH GYMNASIUM AND STORAGE SPACE.

THE ELEVATIONS WERE PROVIDED WITH THESE PLANS AND THEY MATCH THE PROPOSED FIELD HOUSE.

A LANDSCAPE PLAN WAS SUBMITTED SHOWING THE PROPOSED LANDSCAPING IN COMPLIANCE WITH CODE.

DUE TO THE LIMITED SPACE AROUND THE BUILDING.

THE BUILDING PERIMETER TREE PLANTING REQUIREMENTS WILL BE LOCATED AROUND THE NEW DRIVE AISLE, NOTING THAT THE DEVELOPMENT MEETS ALL APPLICABLE GROVE CITY 2050 GUIDING PRINCIPLES.

AFTER REVIEW AND CONSIDERATION, THE DEVELOPMENT DEPARTMENT RECOMMENDS PLANNING COMMISSION MAKE A RECOMMENDATION OF APPROVAL TO CITY COUNCIL FOR THE DEVELOPMENT PLAN WITH THE FOLLOWING STIPULATION. WOULD YOU LIKE TO MAKE ANY COMMENTS? SURE. WE'RE VERY EXCITED TO BE AT THIS STAGE OF DEVELOPMENT.

OUR LONG AWAITED ADDITION FOR ATHLETIC COMMUNITY SCHOOL, CHURCH NEEDS AND JUST VERY HOPEFUL TO GET STARTED AS SOON AS WE GET APPROVALS.

PERFECT. THANK YOU. QUESTIONS OF PLANNING COMMISSION.

IT'S A BEAUTIFUL FACILITY. AND I MEAN, EVERY HIGH SCHOOL KID WOULD LOVE TO HAVE SOMETHING LIKE THAT.

IT'S REALLY COOL. THANK YOU. IS THERE ANY CONCERNS FROM THE FIRE DEPARTMENT ON THE PLANS?

[00:05:01]

ARE THERE ANY COMMENTS FROM THE PUBLIC? ANYONE WHO WOULD LIKE TO SAY ANYTHING.

OKAY. HEARING NONE, WE'RE READY FOR A MOTION.

CHAIR, I MAKE A MOTION THAT WE APPROVE THE CHURCH OF NAZARENE FIELD HOUSE FINAL DEVELOPMENT PLAN.

SECOND AND ROLL CALL. MR. FARNSWORTH. YES. MR..

TITUS. YES. MR.. ROACH. YES, CHAIR. EASTER. YES.

THANK YOU. THANK YOU SO MUCH. WE LOOK FORWARD TO IT.

IT'S GOING TO BE A WONDERFUL BUILDING. ALL RIGHT.

THAT WAS OUR FIRST AND LAST ITEM OF THE DAY. THERE'S ANYTHING ELSE TO BE PRESENTED.

PLEASE STATE. SO NOW. AND SEEING NONE, THE MEETING IS ADJOURNED.

THANK YOU.

* This transcript was compiled from uncorrected Closed Captioning.